New Home in Chester County, PA
Tuesday, September 13, 2011 at 06:48PM
This journal will follow the design and constructon of this extraordinary new home from the start of the design all the way through it's construction. Follow along!
Steve Brown
Steve Brown
Steve Brown
Steve Brown
Framing the 1st floor deck.
Steve Brown
The first floor walls are going up. This video has some design detail commentary.
Steve Brown
Framing 2nd Floor and Walls
Steve Brown
Steve Brown
The roof framing is being completed and the windows are being set.
Steve Brown
The ceiling framing is now completed. The framing co-ordinates the design for lighting, cove lighting, audio systems and trim as well as the exterior facade which reflects this curved form in an exeterior second floor porch. Other intersting ceilings are in the octagon rooms at first and second floors, the master bath room, and the enclosed porch. More video to come.
Steve Brown
Steve Brown
As we shift our attention to the interior finishes, it's nice to look back over start to finish on some of the areas of work. Here is the fireplace construction. The outdoor fireplace is part of garden courtyard in the front of the house.
Steve Brown
One of the signature details of the project is nearing completion, the eyebrow arch of the porte-cochere (drive through).